Rocky Mountain Bio Products - We Fix Dirt
Toll Free (888) 696-8960

Home » Archive

The Flight 93 Story On the morning of September 11, 2001, al Qaeda terrorists hijacked four commercial airliners in a strategically planned attack against the United States. These terrorists intentionally flew two jet airliners into the World Trade Center’s Twin Towers in New York City and a third aircraft into the Pentagon in Arlington, Virginia. …

Read more

Background This site was one of caterpillar’s testing grounds for their equipment. Soils were dug up and replaced over and over again on a regular basis over several years. The problem: Several years of high traffic and disturbance left the soils stripped and depleted of microbial activity, nutrients and any form of plant life. Phase …

Read more

Background: This site is in an arid region of Oregon. The revegetation plan was devised and specified by David Steinfeld from The U.S. Forest Service in partnership with the FHWA (Federal Highway Administration out of Vancouver WA). The Goal / Plan: To reclaim this current soil matrix with quality organic material and with native grasses …

Read more

Background The objective of the hydroseeding project at the Agness Illahe site was to reduce first year soil erosion from disturbed cuts and fill slopes while increasing stability for native seed to germinate. A second objective was to evaluate several combinations of hydromulch glue products supplied by Rantec Company. Gene Davis of Rantec Company and …

Read more

Roadside Revegetation at 8,600 feet in the Rocky Mountains.

  • BIOSOL® 1,300 lbs. per acre
  • Native Seed Mix 50 lbs. Per acre
  • Straw Mulch 2,000 lbs. Per acre
  • Organic Tackifier 150 lbs. Per acre
Read more

BIOSOL Forte® 1,800 lbs. per acre Native Seed Mix 40 lbs. per acre Seed was worked into the soil. BIOSOL Forte® (Mix) applied dry. No mulch was added. No additional fertilizer or maintenance after initial application.

Read more